Standard Qualifications:
- Prices quoted are F.O.B. Urban Waterfalls, crated for shipment.
- Quotation excludes freight charges.
- Payment Terms: 50% deposit required at time of order. Balance due prior to shipment.
- Submittal/approval drawings are included in quoted price. Please allow 1 week lead time.
- Please allow "minimum" six weeks fabrication lead time after approval of drawings.
- Lead time contingent on factory load at time of release, product complexity, and material availability.
|
|
Owner/Customer to provide the following:
- Manpower and equipment necessary to receive and unload crated product from carriers' truck.
- Careful inspecition of product at time of delivery, promptly noting and reporting any visible damages.
- Safe and secure storage of product prior to installation.
- Manpower and equipment necessary to safely deliver/transport crated product to final installation site.
- Manpower and equipment necessary to assist Urban Waterfall's installation supervisor at time of installation.
- 1/4" diameter water supply line. (Only required with automatic fill systems).
- Standard commercial floor sink beneath water wall and 1 1/2" diameter hard piped drain line. (Required with automatic fill systems).
- (2) 115V waterproof gfi duplex outlets.
- Level concrete pad/footing and structural supports.
- Plumber at time of installation to make final connections. (When required).
|
|
Owner/Customer to provide the following:
- Sales/use taxes, licenses, fees, and approval/certification by licensed structural engineer.
- Engineering certifications necessary to meet local building and/or seismic design codes.
- All on-site plumbing and/or electrical materials and labor.
- Final plumbing and electrical connections.
- Decorative surrounds/fascias to conceal lower water storage basin, upper spill reservoir, vertical side posts/supports, water filtration systems, plumbing and electrical connections.
- System maintenance after time of installation.
|
|